An office move goes smoothly when the work is divided into a timeline and every task has an owner. This checklist covers about twelve weeks, from the first lease review to the first week in the new space, and it includes the Florida-specific items that general office checklists skip: building insurance requirements, local business tax receipts, state and tax address updates, and hurricane-season data backups. Stuart Moving Services has been moving Florida families and businesses since 1967, including office relocations through our commercial moving service, so the moving advice comes from experience. For licenses, taxes, and legal filings, confirm current requirements with the agencies named below.
What to Look for in a Commercial Mover
Choose a mover with commercial experience, not just a truck. Ask these questions before you sign:
- Is the company licensed and insured, and can it provide a certificate of insurance on request?
- Has it moved offices of your size and type, such as medical, legal, or tech?
- How does it handle computers, servers, and sensitive records?
- Can it work evenings or weekends to limit downtime?
- Does it offer packing, crating, and storage if the dates do not line up?
Get the estimate in writing, with the crew size, the schedule, and what is included.
12 Weeks Out: Lease, Space, and Team
- Review your current lease for notice periods, restoration obligations, and the move-out date. Missing a notice deadline is an avoidable cost.
- Confirm the new space: lease signed, zoning and occupancy approved for your use, and the move-in date in writing.
- Name one move coordinator and a point person for each department, IT, and facilities.
- Set a budget that covers movers, new furniture, IT and telecom installation, signage, and overlapping rent.
- Request estimates from movers with commercial experience. Ask for an in-person or virtual walkthrough so the quote reflects your real inventory.
10 Weeks Out: IT, Phones, and Internet
- Order internet and phone service for the new space now. Installation lead times are one of the most common causes of move-day delays.
- Map the network: server room, wiring, printers, security cameras, and badge systems.
- Inventory every piece of IT equipment, with serial numbers, and decide what moves and what gets replaced.
- Plan backups. In Florida, schedule a full backup before the move and keep a copy off site, especially during hurricane season, which runs June through November.
8 Weeks Out: Building Rules and Insurance
- Ask both buildings for their move rules: move hours, elevator or loading dock reservations, floor protection, and parking for the truck.
- Ask whether either building requires a certificate of insurance from your mover. Many commercial buildings do, and the building usually names itself as an additional insured, so give your mover the exact wording early.
- Tell your own insurance provider about the new location. Coverage and premiums can change with the address.
- Our commercial movers coordinate parking, elevator reservations, and loading dock access with both buildings before move day.
6 Weeks Out: Declutter and Plan the Layout
- Purge files, supplies, and furniture you will not use. Every item you do not move lowers the cost and the time.
- Schedule shredding for confidential records instead of moving them.
- Create a floor plan for the new office, assign each desk and room, and label the plan so movers and staff use the same codes.
- Decide what needs to be stored while the new space is finished. Storage at our Stuart warehouse holds furniture and equipment short or long term, which helps when move-out and move-in dates do not match.
4 Weeks Out: Packing and Communication
- Order supplies and decide who packs what. Our packing service offers full packing, partial packing for the items you choose, or do-it-yourself with our supplies, and electronics and artwork often deserve professional packing.
- Give each employee a packing guide and a deadline, and have everyone label boxes with the department code and the destination room.
- Notify clients, vendors, and your bank of the new address and date.
- Order new signage, business cards, and printed materials.
2 Weeks Out: Confirm and Update Records
- Confirm the move date, crew size, truck access, and the certificate of insurance with the mover and both buildings.
- Update your address with the Florida Division of Corporations (Sunbiz), using your Document Number.
- Notify the Florida Department of Revenue of the new location. A move to a different county requires a new Florida Business Tax Application (Form DR-1).
- Notify the IRS of the address change using Form 8822-B.
- Check with your city or county tax collector about your Local Business Tax Receipt. A change of location often requires an update or new application, and the new location may need zoning approval or an inspection first.
What Makes an Office Move Cost More or Less
- The amount of furniture and equipment, and how much of it is purged beforehand.
- Stairs, elevators, long carries, and loading dock access at either building.
- Specialty equipment such as servers, lab or medical equipment, safes, and artwork.
- Timing. Evening and weekend moves can cost differently from weekday moves.
- Packing. Employees who pack their own desks reduce labor on move day.
- Storage needs while the new space is finished.
Moving Week: Final Preparations
- Back up all data and confirm the IT cutover plan. Decide who disconnects and reconnects each system.
- Have employees move personal items, laptops, and valuables themselves.
- Walk both spaces with the move coordinator and mark anything that must not be packed.
- Plan the move for evenings or a weekend to limit downtime, and phase the move by department if the office is large.
Moving Day
- Keep the move coordinator on site with a floor plan and a department list.
- Put one person at each end to direct boxes and furniture.
- Check that the loading dock, elevators, and parking are available at the reserved times.
- Photograph valuable furniture and equipment before loading and after unloading.
In Florida, check the forecast and any storm watch before the date. Rain and storm delays can affect loading, and a spare day in your schedule can save a rushed move.
The First Week in the New Office
- Test phones, internet, printers, badge access, and security systems before staff arrive.
- Check furniture and equipment for damage and report any claim to your mover quickly.
- Update your website, Google Business Profile, directory listings, and email signatures with the new address.
- Have the mail forwarding in place with the USPS and confirm your vendors and clients have the new address.
If your business is planning an office move, call us at (772) 223-6683 to talk through your timeline and what you want handled.
Services
Frequently Asked Questions
Do I need a certificate of insurance for my movers?
Do I need a new local business tax receipt when I move?
Which agencies should I notify of a new business address in Florida?
What is the best time of day or week to move an office?